Skip to main content

Choice of Baseline Period for Limited Baseline Aberration Detection Methods

Description

This paper evaluates the operating characteristics of limited baseline aberration detection methods using different lengths (7-28 days) and end dates (1-7 days prior to the current day) for the baseline period using simulated outbreaks added to real data and simulated data representative of real data.

Submitted by elamb on